i. HV/MV breakers timing (opening / closing).
ii.
Contact resistance of HV/MV/LV breakers.
iii.
Power Transformer up to 500 MVA.
iv.
Transformer Turn Ratio testing.
v. Transformer Winding Resistance measurement.
vi.
MV cables, splicing and terminations.
vii. Secondary Injection Testing of Protection Relays.
viii. Primary Injection Testing of LV Breakers up to 4000 Amps.
ix. UPS and DC battery bank.
x. Infra-red Thermo-graphic inspection of MV/LV networks.
xi. Calibration of Electrical Analog/Digital panel meters.